• [email protected]
    link
    fedilink
    17
    edit-2
    1 month ago

    It would look more intentional if the top floor followed the pattern. Wonder what caused the workflow to break down

    • @[email protected]
      link
      fedilink
      English
      141 month ago

      One of the many times this was reposted, someone had an interesting explanation. These walls are pre-fabricated, and they were mixing up the sections that go on the right with those that go on the left, or maybe walls from other sides of the building.

      • ᴍᴜᴛɪʟᴀᴛɪᴏɴᴡᴀᴠᴇ
        link
        fedilink
        English
        101 month ago

        I saw something like this happen in a new hospital building. What they were doing was cutting the original wood for the headboard, then they used that as a template for the next one, which was used as a template for the next one, at least fifty times. By the end none of the shit lined up at all and it all had to be redone.