SpaceX Starship page

FAQ

  1. When next launch? (Flight 8) NET April, “4 to 6 weeks” after Flight 8. (Elon)
  2. When previous launch? (Flight 7)? Booster 15 and Ship 34 launched on 2025-03-06.
  3. What was the result? Booster lands on chopsticks, ship experiences an RUD shortly before SECO.

Quick Links

Nerdle Cam | Lab Cam | Sapphire Cam | Sentinel Cam | Rover Cam | Rover 2.0 Cam | Rocket Ranch Cam | Plex Cam | NSF Starbase Live

Starship Dev February | Flight 7 launch thread | Starship Dev January | Starship Dev December | Starship Dev November | IFT-6 launch thread | Starship Dev October

Official SpaceX Starship Update Video (2024-04-06)


Road closures and road delays

Cameron County website - @bocaroad Mastodon bot

Vehicle Status

*As of 2025-03-24

Ship Location Status Comment
SN2 Rocket Garden Pending scrapping?
S20 Rocket Garden Pending scrapping?
S31 Indian Ocean Successful splashdown Cryo tested May 12th, suffers small electrical fire. Underwent repairs in the Highbay, rolls back to Massey’s Jul 1. Cryo tested Jul 2nd and 3rd. Engines installed by Jul 26th. Rolls to Massey’s Sep 6th. Partial (aborted) cryo test Sep 8th. Static fired Sep 18th. Preflight checkouts completed Nov 17th. Launched as IFT-6 on Nov 19th. In-space raptor relight was successful, ship survived reentry and performed soft splashdown in the Indian Ocean.
Test Tank 16 Sanchez Resting Cryo tested four times between July and September. Sliding plates added to the catch points on Jan 27th. Moved to Sanchez Mar 15th.
S34 Caribbean Destroyed Methane header tank spotted Aug 14th. Nosecone stacked on payload bay Sep 20th. Stacking completed around end of November. Cryo tested Jan 17th. Static fired Feb 11th. FTS installed Feb 24th. Launched Mar 6th, experienced an RUD shortly before SECO.
S35 Megabay 2 Pending engine install Parts spotted Sep 20th. Forward flap installation Dec 3rd. Nosecone stacked on payload bay Dec 11th. Stacked by Feb 7th. Cryo tested Mar 11th.
S36 Megabay 2 Stacking Parts spotted in December. Moved to Megabay 2 Feb 12th.
S37 Megabay 2 / Starfactory Stacking / nose cone tiling Parts spotted in December. Forward dome section moves to Megabay 2 Mar 24th.
S38 Starfactory Nose cone tiling Parts spotted in December.
Booster Location Status Comment
B12 Rocket Garden Resting Cryo x2, Static fire Jul 15th. Full stack cryo tests Sep 23rd and Oct 7th. FTS installed Oct 9th. Launched as IFT-5 on Oct 13, returned to launch site for successful chopstick catch. Moved to Megabay 1 Oct 15th.
B14 Megabay 1 Post-flight inspection Stacked Apr 26th, Cryo tested Oct 4th and 5th. Static fired Dec 9th. FTS installed Jan 3rd. Wet dress rehearsal performed Jan 10th. Launched and landed Jan 16th.
B15 Rocket Garden Resting Stacked from July to September. Methane tank cryo test Dec 27th, full cryo test Dec 28th. Static fired Feb 9th. Launched and landed Mar 6th.
B16 Megabay 1 Pending engine install Stacking completed by Dec 26th. Cryo tested Feb 28th.
B17 Build Site Assembly Parts spotted. First two sections moved to Megabay 1 Jan 4th.
B18.1 Build site Assembly Likely a test article for Block 2 boosters. Parts spotted Feb 24th.

Resources

  • @[email protected]
    link
    fedilink
    English
    122 months ago

    I just wanted to say thanks for running this community, and not by just linking to the other place. Much appreciated.

    • threelonmusketeersOPM
      link
      fedilink
      English
      112 months ago

      Thanks for your comment, it’s nice to know my efforts are appreciated! Hope to see you around. Sometimes I feel like I’m shouting into the void…

      not by just linking to the other place

      Of course. I link from The Other Place to here :)

  • threelonmusketeersOPM
    link
    fedilink
    English
    2
    edit-2
    18 days ago

    Starbase activities (2025-03-31):

    McGregor:

    • Block 2 booster header tank prototype seems to have survived can-crusher and pressure tests. (Anderson / NSF)

    KSC:

    Flight 7:

  • threelonmusketeersOPM
    link
    fedilink
    English
    421 days ago

    Starbase activities (2025-03-29):

  • threelonmusketeersOPM
    link
    fedilink
    English
    422 days ago

    Starbase activities (2025-03-28):

    Other:

    • Starship wins a NASA Launch Services contract (being added to an existing FH and F9 contract). (NSF, NASA)
  • threelonmusketeersOPM
    link
    fedilink
    English
    423 days ago

    Starbase activities (2025-03-27):

    KSC activities:

    • LC-39A: Following an extended period of maintenance work and upgrades, the chopsticks return to the closed position. (NSF)
  • threelonmusketeersOPM
    link
    fedilink
    English
    4
    edit-2
    24 days ago

    Starbase activities (2025-03-26):

    • Mar 25th cryo delivery tally. (ViX)
    • Build site: Overnight, a cryo tank is delivered from Brownsville Port to the tank farm. (ViX)
    • Tank farm is still under construction, but testing of some of the new fluid systems for Pad B begins. (Golden 1, Golden 2)
    • Roundabout road construction continues. (Starship Gazer, Gisler)
    • Pad A: A new pipe is installed on the tower. (ViX)
    • Pad B: Lateral chopsticks testing. (ViX)
    • A boom lift is lowered into flame trench. (NSF)
    • Gisler posts recent video of concrete pouring and gantry construction work.
    • Concrete deliveries continue. (Gisler)
    • The new deluge manifold has been welded, despite possibly being installed backward. (Gisler 1, Gisler 2, booster_10)
    • Build site: Starfactory internal wall construction continues. (ViX)
    • Highbay deconstruction continues, and the first segment of wall is removed. (ViX 1, ViX 2, NSF, LabPadre 1, LabPadre 2, ViX 3, Gisler)
    • Starship Gazer posts a photo of B14 in Megabay 1.
    • Massey’s: RGV Aerial post a recent photo of the Block 2 booster cryo test stand.
  • threelonmusketeersOPM
    link
    fedilink
    English
    425 days ago

    Starbase activities (2025-03-25):

    • Mar 24th cryo delivery tally.
    • Build site: Highbay deconstruction continues, with the removal of rail/beam pieces. (ViX 1, ViX 2, ViX 3, ViX 4)
    • Launch site: Pad A chopsticks testing. (ViX)
    • Construction of the Pad B flame trench continues. (ViX)
    • Tank farm testing with loud venting. (ViX)
    • 2-hour road delay is posted for Mar 26th between 00:00 and 04:00 for transport from Brownsville Port to the pad.

    KSC activities:

    • LC-39A: Workers are installing sheet pilings into the ground, presumably prior excavation of a flame trench. (Anderson / NSF)
  • threelonmusketeersOPM
    link
    fedilink
    English
    626 days ago

    Starbase activities (2025-03-24):

  • threelonmusketeersOPM
    link
    fedilink
    English
    527 days ago

    Starbase activities (2025-03-23):

    • Mar 22nd cryo delivery tally.
    • Launch site: Pad B chopstick testing continues. (NSF 1, NSF 2, ViX)
    • The recently delivered prefabricated electrical control building for the Pad B tank farm moves to the launch site. (ViX, NSF)
    • Installation of wall sections in the Pad B flame trench continues. (ViX 1, ViX 2)
    • Build site: The recently assembled LTM11200 crane is laid down, and extra reeving was done to the block. (ViX 1, ViX 2)
    • Highbay deconstruction continues. (cnunez)
    • Starship Gazer posts recent video of Highbay deconstruction.
  • threelonmusketeersOPM
    link
    fedilink
    English
    628 days ago

    Starbase activities (2025-03-22):

    • Mar 21st cryo delivery tally.
    • Overnight, more chopsticks testing at Pad B. (NSF, ViX)
    • Build site: Highbay roof deconstruction continues. (NSF, Starship Gazer 1, Starship Gazer 2, Gisler, RGV Aerial)
    • Assembly of the LTM11200 crane is completed. (NSF, ViX 1, ViX 2, Starship Gazer)
    • Water spray holes are drilled in the Pad B flame deflector. (Starship Gazer)
    • S36 in Megabay 2. (Starship Gazer)
    • S38 nosecone tiling in Starfactory. (cnunez)
    • Pad B: Another wall section is lifted into the Pad B flame trench. (ViX)
    • Pad B gantry construction continues. (Starship Gazer, Gisler)
    • Deluge pipes are piling up at Pad B. (Gisler)
    • Tank farm: A prefabricated electrical control building for the Pad B tank farm is delivered. (ViX 1, ViX 2, Starship Gazer, Gisler)
    • A sump and a pump are installed at the tank farm expansion. (ViX)
    • Additional pipes indicate that more pumps are still pending installation. (Gisler)
    • New walls are poured near the tank farm. (Gisler)
    • Other: Construction of the roundabout continues. (Gisler)
    • RGV Aerial post recent flyover photos of Massey’s and Pad B.
    • Elon on Ship V3 timeline: “We are honing in on the V3 Starship design. @SpaceX is tracking to a Starship launch rate of once a week in ~12 months. That will yield ~100 tons to @Starlink orbit with full reusability.” (Elon, Elon Time)
  • threelonmusketeersOPM
    link
    fedilink
    English
    829 days ago

    Starbase activities (2025-03-21):

    • Mar 20th cryo delivery tally.
    • Build site: Overnight, B16 moves from Massey’s to Megabay 1. (NSF, LabPadre, ViX 1, ViX 2)
    • A Berry LTM11200 is assembled in the ring yard, reportedly the same crane which built Starship MK1 back in 2019. (ViX 1, ViX 2)
    • Highbay deconstruction continues with more cutting work on the roof, which results in a rather pretty shower of sparks inside the Highbay. (cnunez, ViX, Anderson / NSF)
    • Launch site: Three new wall sections for the Pad B flame trench are delivered bringing the total to six. (ViX, Render from Killip)
    • Two wall sections have been installed in the flame trench so far. (ViX)
    • Pad B chopsticks are raised to the top of the tower for the first time. (LabPadre, ViX, Anderson / NSF)
    • Other: RGV Aerial conduct a flyover, and post a picture of another shipment of cryo tanks pulling into port. This is likely explains the Mar 23rd transport notice.
  • threelonmusketeersOPM
    link
    fedilink
    English
    630 days ago

    Starbase activities (2025-03-20):

    • Mar 19th cryo delivery tally.
    • Mar 19th addendum: Chopsticks testing at Pad B. (ViX)
    • Launch site: A new power and communications bunker is delivered. (ViX 1, ViX 2)
    • Wall sections for the Pad B flame trench are delivered. (ViX 1, ViX 2, Starship Gazer)
    • One of the wall sections is lowered into the Pad B flame trench, and water is delivered for the Pad A deluge system. (ViX)
    • Zack Golden’s thoughts on flame trench progress. (Golden 1, Golden 2, Golden 3, Golden 4)
    • RGV Aerial post recent flame trench and a labelled map of the launch site.
    • 2-hour road delay is posted for between Mar 21st 22:00 and Mar 22nd 04:00 for transport from Brownsville Port to the pad.
    • 2-hour road delay is posted for Mar 23rd between 00:00 and 04:00 for transport from Brownsville Port to the pad.
    • Build site: A crane is in position to demolish the end wedge section of Starfactory, and a ship forward dome section is pending rollout. (ViX)
    • Highbay disassembly continues with the removal of more roof sections and windows, and the arrival of another crane. (ViX 1, ViX 2)

    McGregor:

    • A Raptor 2 is tested to destruction. (Hayden)
  • threelonmusketeersOPM
    link
    fedilink
    English
    71 month ago

    Starbase activities (2025-03-19):

  • threelonmusketeersOPM
    link
    fedilink
    English
    7
    edit-2
    1 month ago

    Starbase activities (2025-03-18):