    There are two kinds of meetings: decision meetings and update meetings. Update meetings are bullshit time sinks designed to validate the complete chain of command. Decision meetings are where something tangible is determined.

    The former is the vast bulk of meetings. The latter is a rarity, and sometimes only possible after fully satiating the beast that is the former.

    • @[email protected]
      link
      fedilink
      14 months ago

      So your PM is useless too? I feel like updates can be useful if others then go and help each other out with things.

  • @[email protected]
    link
    fedilink
    English
    304 months ago

    Scrum is just something I have to endure in order to get paid to program. The worst is when you’re working on something hard and your status hasn’t changed substantially from the previous day. “I did a bunch of things that didn’t pan out, so I only really have an expanding list of things that are not the problem. No, assigning someone to help me is unlikely to resolve the issue faster.”

    • kamenLady.
      link
      fedilink
      184 months ago

      At least you’re getting assigned a human. My boss’ new habit is to print out what chatGTP thinks about the problem I’m working on, if i take too long solving it…

    • @[email protected]
      link
      fedilink
      54 months ago

      “no, having a meeting about it won’t help, it will just waste my time that I could be using to figure out the problem.”

      • @[email protected]
        link
        fedilink
        English
        14 months ago

        I had a manager years ago who viewed his involvement in problem-solving as a variant of the rubber duck solution. I always wanted to tell him to his face that he was accurate, in the sense that he brought about as much to the table as an actual rubber duck.

    • @[email protected]
      link
      fedilink
      English
      1
      edit-2
      4 months ago

      You can not come in here with your nice colleagues and reasonable work experience. I guess it is a big corp vs small company experience.

  • @[email protected]
    link
    fedilink
    English
    234 months ago

    At some point in the future, someone will understand what I mean by “I haven’t had enough time between meeting to read the necessary materials” because I can’t learn shit from verbal discussion.

    If that ever actually happens, i firmly believe I will get more time to actually do work too.

    • @[email protected]
      link
      fedilink
      264 months ago

      It’s an attempt to get a handle on things and trying to avoid situations such as:

      “Oh, I was struck on that point for the last 3 months. I reinvented the wheel 2 times and now it works.”

      “And now we’re 3 months behind schedule. Why didn’t you ask anybody?”

      “Yeah, I didn’t want to bother anyone. But I did put in on the timesheets.”

      “It says ‘working on project’.”

      And that’s how regular project update meetings get scheduled, and a bunch of messages asking for updates.

      • @[email protected]
        link
        fedilink
        English
        124 months ago

        Well, at least they can see the baby steps that way I guess.

        But I’ve always wondered if I’m actually terrible at my job or if PMPs, Scrum Masters, Management, etc, can’t actually fathom that I have absolutely no way to roughly estimate how long something can possibly take that ive never done before, and I have no evidence someone else has done it before.

        When I was younger I got so frustrated with it I asked if anyone else on the team wanted to do it instead, and there was a resounding no, but it’s feasible so you should keep at it. And eventually I get it working but the whole time it’s demoralizing with the amount of “why are you not done?”

        And now I just give the exact details that goes straight over everyone’s heads anyway and ask if they need me to switch my priorities.

        • @[email protected]
          link
          fedilink
          94 months ago

          Well, often they know it´s hard to estimate, but the entire corporate system is built around having things done by a certain date, your time costs money and payments are usually linked to those dates. They don´t really have a choice but to make a planning based on the estimates you give and monitor the progress so they can give the proper level of panic to their bosses. Of course, software has always been a disaster with estimates and attempts to tame the chaos haven´t been that successful.

          I usually make a ridiculously detailed list of all tasks. ¨Add button A on screen. Discuss details: 2 hours. Interface work: 0.5 hour. Code work: 2 hours. Database work: 2 hours. Testing: 2 hours. FAT: 2 hours. Changes after FAT: 1 hour. SAT: 2 hour. Test script: 1 hour. Update documentation: 2 hours. Add button B … ¨ Put it all in an excel sheet and summarize. Most PMs don´t even want to start arguing a list like that, and it seems to make a reasonably good estimate for me.

    • @[email protected]
      link
      fedilink
      English
      114 months ago

      Which is worse: forcing a programmer to attend daily meetings, or forcing them to work in an “open plan” office? If I had to choose one or the other, I would choose to go work on a garbage truck.

      • @[email protected]
        link
        fedilink
        34 months ago

        Forcing programmers into an office at all should be enough to get a manager dragged before the ICJ on charges of crimes against humanity

  • @[email protected]
    link
    fedilink
    134 months ago

    Here here!

    I love meetings about the general idea and concept of a project that takeip the “doing” timeof the single person that will do the work.

  • @[email protected]
    link
    fedilink
    14 months ago

    I just don’t understand why they apologize.

    They could probably write “You’re welcome.” and get a bunch of thank yous back.

  • @[email protected]
    link
    fedilink
    33
    edit-2
    4 months ago

    I just don’t go the meetings, if they actually need me my boss send me a DM asking me to enter, otherwise she just tell me what I need to know. Only when she can’t participate on the meetings she ask me to enter and told her if they talked about something relevant for us.

  • @[email protected]
    link
    fedilink
    74 months ago

    Fuck you and your idea of productivity. Just because your job is reporting on the status of other people’s hard work doesn’t mean that’s how to get shit done - by talking. It takes doing to do shit.

  • @[email protected]
    link
    fedilink
    104 months ago

    One of the first things my new boss did was to cancel the daily standup meetings that were enforced by the previous management. God, what a great decision. I’m finally getting shit done instead of having to talk and endure bullshit every day.

    • @[email protected]
      link
      fedilink
      English
      14
      edit-2
      4 months ago

      I call it the numbing hour. It’s only scheduled as a half hour but it always runs for nearly an hour. I never speak for more than two minutes, I just stand there as my motivation to do literally anything for the rest of the day burns down to zero. Sometimes I wake up 110% motivated with a list of stuff I can’t wait to get done, fortunately the numbing hour is first thing everyday ensuring that I am always fully neutralized.

      • @[email protected]
        link
        fedilink
        24 months ago

        At least you have until the end of the day to (try to) regain some motivation. My daily is currently at the 10am. Smack dab in the middle of the morning.

  • @[email protected]
    link
    fedilink
    74 months ago

    That’s okay, we can reschedule the 1 of the 60 TFCV meetings about theupcoming 5 TPS meetings, that so we can be prepared for the 2 SMR meetings in 3 and 4 months, which is needed for the the BRM meeting in 6 months. Then we’ll see if anything is decided at the BRM meeting. If not we’ll repeat the meeting schedule for the foreseeable future.